Case Study 2010. FPSO Towing Monitoring

Client

Samsung Heavy Industries / Global Maritime Engineering

Challenge

To monitor dynamic strain at various points on the Flare Tower on board BP’s Skarv FPSO (floating production, storage and offloading) vessel. The purpose is to ensure that no fatigue damage occurs during the long tow from its manufacturing port in South Korea to its operation site offshore Norway.

Resolution

16 SmartPatch sensors, SmartScan instrumentation, and interconnecting fibre were successfully installed & commissioned by a SF Technician in 3 days

 

Top Left Image Below  - BP's Skarv FPSO
Middle Image Below  - The flare tower
Right image Below  - SmartPatch Sensor application on tower leg
Lower Left Image Below  - Installed sensor with waterproof coating

Related Products

FBG Sensors

SmartScan

FBG strain and temperature sensor

SmartPatch